Luxury fibreglass pool installation
    Our Process

    From First Chat to First Swim

    We've built over 250 pools a year. This is the process we've refined to make yours stress-free, on time, and exactly as promised.

    250+ pools annually
    28-day build
    Council to completion handled
    Zero surprises

    Here's exactly what happens — nothing hidden, no surprises.

    1

    Free Site Visit

    1–2 hours. We come to you. Measure the yard, assess access and soil, discuss your vision, give transparent pricing on the spot. No pushy sales.

    2

    3D Design & Render

    We create a 3D render of your pool in your actual backyard — colours, positioning, size — before you commit to anything.

    3

    Contract & Deposit

    Your contract covers every detail: pool model, colour, inclusions, timeline, price. No hidden extras added later.

    4

    Pre-Start Site Visit

    This is what most builders skip. A 1.5–2 hour visit with our Construction Manager before excavation starts. Every measurement checked, every detail planned. This is why our builds run on time.

    5

    Council & Approvals

    We handle all DA/CDC applications, engineering certs, barrier compliance, and council liaison. You receive copies of everything. Typically 2–4 weeks.

    6

    Excavation Day

    Our licensed team digs to exact specification. Water goes into your pool the same day — industry-leading efficiency.

    7

    Pool Installation

    Your Graphene Nano-Tech shell is craned into position in a single day. Plumbing, filtration, and electrical all connected.

    8

    Concrete & Paving

    This is where it comes to life. Category 1 stone pavers included as standard, plus a second row at the deep end.

    9

    3 Cleans + Handover

    Two cleans during construction, one at handover. Full Pool School session covering equipment, water chemistry, and maintenance. You leave knowing exactly how to run your pool.

    10

    First Swim

    Pool filled, water balanced, you're in. Our service team proactively checks in at 30 days.

    Photorealistic 3D render of a fibreglass pool in a backyard

    See your pool before you build it

    Every proposal includes photorealistic 3D renders of your pool in your actual backyard — pool, paving, fencing, water features and retaining walls. No guesswork, no flat drawings.

    Explore our 3D renders

    What Sets MFP Apart

    These aren't marketing claims — they're the specific things we do that most builders don't.

    The Pre-Start Visit

    Before we break ground, our Construction Manager visits your site. Every measurement re-checked, every detail confirmed. This is why our builds run on schedule.

    200mm Edge Beam

    The industry standard is 100mm. We build at 200mm — structurally independent, no secondary ring beam required. Engineered to stand alone.

    Graphene Nano-Tech Shell

    The strongest fibreglass pool ever built. Graphene Nano-Tech is 200x stronger than steel, built into every MFP pool as standard. Backed by an Extended Lifetime Structural Warranty.

    3 Cleans During Your Build

    Two professional cleans during construction, one at handover. Your neighbours won't even know we were there.

    Live Customer Portal

    Your live customer portal tracks your project's progress, keeps you up to date on payments, and any information we need from you.

    We Handle Everything

    Council approvals, engineering certs, compliance, paperwork. You don't project-manage your own build — that's our job.

    Every Pool Includes All of This

    No add-ons. No surprises. This is what comes standard with every MFP build.

    Excavation & soil removal from site
    Franna crane to lift pool into position
    Graphene Nano-Tech pool shell
    Extended Lifetime Structural Warranty
    Lifetime Interior Surface Guarantee
    Premium variable speed pump
    Oversized cartridge filter
    Mineral chlorinator
    Multi-colour LED underwater light
    Pool fully plumbed for install
    Council certification + CAD drawing
    Pre-fabricated concrete slab + engineer-approved drainage
    Geo-technical soil test + fire ant test
    400mm paved coping with premium pavers on all sides
    800mm paved coping on the deep end (with quad skimmer lid)
    Engineered concrete bond beam + backfill + water fill
    1 year's supply of minerals — FREE
    Startup chemical box (Alkalinity Up, Shock'n'Swim, pH Down + more)
    4-in-1 minerals test kit + sample bottle
    Pool School training session
    Dropbox education library (videos & FAQs)
    3 cleans during build + 1 clean at handover
    Temporary pool fence hire (up to 8 weeks)

    Common Questions About Our Process

    Quick answers about timing, approvals, and what happens on site.

    Ready to start your build?

    Book your free site visit — no obligation, no pressure. We come to you, measure your yard, and give you straight pricing on the spot.

    Mon-Fri 8am-5pm, Sat 9am-1pm